Tag Archive for: TCO

checklistApplication Notes

Buyer’s Guide: Power Conversion Systems for Railway Applications

Buyer’s Guide · EN 50155

Buyer’s Guide: Power Conversion Systems for Railway Applications

EN 50155 and associated standards: everything you need to specify, evaluate and select power supplies, converters and inverters for rolling stock

EN 50155
Core railway standard (2017 revision)
OT1–OT6
Temperature classes −40 °C to +85 °C
25–30 yr
Required rolling stock service life
12
Key supplier questions for qualification

1. Introduction: why this guide matters

The railway sector is one of the most demanding environments for electronic equipment. Power supplies, DC/DC converters, DC/AC inverters, battery chargers and frequency converters operating in rolling stock must withstand extreme conditions of temperature, humidity, vibration, mechanical shock, electromagnetic interference and voltage fluctuations — for 25 to 30 years of service life.

The European standard EN 50155 (equivalent to the international IEC 60571) defines the minimum requirements for this equipment. However, EN 50155 does not operate in isolation: it is complemented by an ecosystem of additional standards — EN 50121 (EMC), EN 45545 (fire protection), EN 61373 (shock and vibration) — that together determine whether a power conversion device is suitable for railway use.

This guide serves two audiences: design engineers who need to correctly specify converters and power supplies, and procurement managers who need objective criteria to evaluate suppliers and make total-cost-of-ownership decisions.

2. The railway standards ecosystem

A power conversion device for railway use must comply with several standards simultaneously, each covering a specific domain:

  • EN 50155:2017 — Core standard: general requirements for all on-board electronics
  • EN 50121-3-2 — Electromagnetic compatibility (EMC) for rolling stock equipment
  • EN 45545-2 — Fire protection and material flammability
  • EN 61373 — Shock and vibration profiles by installation location
  • IEC 60571 — International equivalent to EN 50155
Key point: When requesting a power supply or converter for railway use, it is not enough to ask for “EN 50155 compliance”. You must also specify the EMC requirements (EN 50121-3-2), fire protection (EN 45545-2) and shock/vibration (EN 61373) applicable to the specific equipment location within the vehicle.

3. EN 50155 in detail: key requirements

EN 50155:2017 (replacing the 2007 version) establishes general requirements for all electronic equipment installed on railway rolling stock. For a general introduction to the standard, see What is EN 50155 for railway applications.

  • Supply voltage: continuous, transient and interruption ranges for each nominal voltage
  • Operating temperature: six classes (OT1 to OT6) depending on equipment location
  • Humidity: up to 75% yearly average, 95% for 30 days/year and occasionally 100%
  • Altitude: operation up to 1,400 m (up to 3,000 m under special conditions)
  • Insulation: dielectric strength and insulation requirements between circuits
  • EMC: reference to EN 50121-3-2 for emission and immunity
  • Type tests: full programme including thermal cycling, humidity, shock/vibration and EMC

The 2017 version introduced significant changes: six temperature classes instead of two, more detailed supply interruption requirements, and greater manufacturer/end-user responsibility to define actual operating conditions.

4. Input voltage ranges: classes and tolerances

EN 50155 defines nominal battery voltages of 24, 28, 36, 48, 72, 96 and 110 VDC (recommending 24, 72 or 110 V). For each nominal voltage, the continuous operating range is 0.7 to 1.25 × Unom, and short fluctuations from 0.6 × Unom (0.1 s) up to 1.4 × Unom (1 s) must be withstood without loss of function.

Practical tip: When specifying a converter, always request that the input range covers from brownout (0.6×Unom) to transient overvoltage (1.4×Unom). This ensures full EN 50155 operation without requiring additional external protection circuits.

5. Operating temperature classes (OT1–OT6)

EN 50155:2017 defines six operating temperature classes. The applicable class depends on the equipment location within the vehicle:

  • OT1: −25 °C to +55 °C — passenger compartments and driver’s cabs
  • OT2: −40 °C to +55 °C — passenger compartments and driver’s cabs in cold climates
  • OT3: −25 °C to +70 °C — default class; technical cabinets and equipment compartments
  • OT4: −40 °C to +70 °C — technical cabinets in cold climates
  • OT5: −25 °C to +85 °C — high-temperature locations
  • OT6: −40 °C to +85 °C — high-temperature locations in cold climates
Important: The standard states that OT3 is the default level. If your specification does not indicate a temperature class, the supplier will assume OT3 (−25 °C to +70 °C). Always specify the required class explicitly. Cold-start capability at the minimum class temperature must also be verified during type tests.

6. Supply interruptions and hold-up time

EN 50155 defines mandatory output maintenance during input supply interruptions. It defines interruption classes (S1–S3) and supply change-over classes (C1–C2):

  • S1: no ride-through required during supply interruptions
  • S2: 10 ms interruption without loss of function (default class)
  • S3: 20 ms interruption without loss of function
  • C1: supply change-over at 0.6 Unom for 100 ms, without interruption
  • C2: supply change-over with a 30 ms interruption
Practical tip: S2 (10 ms) is the default interruption class; C1 or C2 apply where the supply changes over between sources. When evaluating offers, ask the supplier how hold-up is achieved: with internal capacitors integrated in the converter, or with external hold-up modules. The integrated solution reduces system BOM and simplifies certification.

7. Complementary standards

EN 50121-3-2 — Electromagnetic compatibility (EMC)

Defines emission and immunity limits for on-board rolling stock equipment. Power converters are among the main sources of EMC interference on board.

  • Conducted emission: limits in the 150 kHz–30 MHz range
  • Radiated emission: limits in the 30 MHz–1 GHz range
  • Immunity: ESD (EN 61000-4-2), fast transients (EN 61000-4-4), radiated (EN 61000-4-3), conducted (EN 61000-4-6)
  • Surge: immunity to surge up to 1 kV (EN 61000-4-5)

EN 45545-2 — Fire protection

Defines the fire behaviour of materials in railway vehicles. Hazard Level (HL1–HL3) classification — most rolling stock requires HL2 or HL3. Tests cover flammability, smoke generation, gas toxicity and burning material dripping.

EN 61373 — Shock and vibration

Defines shock/vibration profiles by installation location:

  • Category 1, Class A: equipment mounted directly on or under the vehicle body
  • Category 1, Class B: equipment mounted inside a cubicle or case that is itself mounted on the vehicle body
  • Category 2: bogie-mounted equipment
  • Category 3: axle-mounted equipment (highest severity)
Always specify the required EN 61373 category and class. A converter qualified for Category 1 (body-mounted) is not automatically suitable for Category 2 (bogie) or Category 3 (axle) installation; severity increases from Category 1 to Category 3.

8. Converter types for railway applications

Power conversion equipment for railway covers a broad range of topologies and functions:

  • DC/DC converters: auxiliary supplies for control electronics, sensors and communications (24–110 V input, 5–48 V outputs, 5 W–1 kW)
  • DC/AC inverters: passenger amenity loads, HVAC auxiliaries, lighting systems (single- or three-phase, 230/400 VAC output)
  • Battery chargers / rectifiers: traction battery and UPS charging, emergency supply (72–110 V input, configurable output)
  • Frequency converters (AC/AC): 50/60 Hz conversion for international rolling stock, fan speed control
  • High-power traction auxiliaries: head-end power, hotel power systems (10–100+ kVA)

Custom engineering is typically required to match the specific form factors, connector layouts, insulation classes and certification requirements of each rolling stock programme.

9. Selection criteria: 12 key questions for your supplier

When evaluating power converter suppliers for railway applications, these 12 questions distinguish a qualified supplier from one that merely claims compliance:

1Certifications: Can you provide EN 50155:2017 type test certificates issued by an accredited laboratory — including EN 50121-3-2, EN 45545-2 and EN 61373?
2Temperature class: For which OT class (OT1–OT6) is the product designed? Have you performed cold-start tests at the minimum temperature?
3Full input range: Does the converter operate from brownout (0.6×Unom, 100 ms) to transient overvoltage (1.4×Unom, 1 s) without external protection circuits?
4Hold-up time: Which interruption classes are supported (S1/S2/S3, C1/C2)? Is hold-up integrated or external?
5Fire protection: Do materials meet EN 45545-2 HL2 or HL3? Provide flammability, smoke and toxicity certificates.
6MTBF / reliability: What is the calculated MTBF per MIL-HDBK-217 or SN 29500? At which ambient temperature?
7Customisation: Can you adapt voltages, power levels, mechanical form factors and connectors to project-specific requirements?
8Manufacturing: Where is the product manufactured? What quality certifications does the plant hold (ISO 9001, IRIS/ISO 22163)?
9Traceability: Do you offer full component and batch traceability for the vehicle lifecycle (25–30 years)?
10Lifecycle support: Do you guarantee product or functional-equivalent availability for 25–30 years?
11Lead times: What are typical lead times for prototypes and series production? Do you offer just-in-time delivery?
12Railway references: Can you provide references with tier-1 OEMs? How many years of railway sector experience do you have?

10. Total cost of ownership (TCO) vs. unit price

One of the most common purchasing mistakes is basing the decision exclusively on unit price. The true cost of a converter over 25–30 years includes:

  • Integration cost: standard converters may require external EMC filters, hold-up modules, mechanical adapters and additional protection circuits — a custom converter eliminates these
  • Certification cost: fewer components = fewer type tests = lower certification cost
  • Field failure cost: higher MTBF = fewer maintenance interventions, less vehicle downtime, fewer contractual penalties
  • NRE engineering cost: amortised over a platform if integration and maintenance savings are significant
  • Obsolescence cost: a supplier guaranteeing 25–30 year lifecycle support avoids costly redesigns
  • Logistics cost: European manufacturing eliminates import tariffs and reduces shipping times
TCO = Unit price + Integration cost + (Cost per failure × Failure rate × Lifetime)
+ Certification cost + Logistics cost + Obsolescence cost

When requesting a quotation, ask the supplier to break down not just the unit price but also the expected MTBF, the integration components required and the long-term support commitment.

11. Specification checklist

Use this checklist when drafting the technical specification for your next railway project:

  • ☐ Nominal input voltage (Unom) and voltage range
  • ☐ Required temperature class (OT1–OT6)
  • ☐ Hold-up class required (S2/C2 or other)
  • ☐ EN 50121-3-2 EMC class
  • ☐ EN 45545-2 Hazard Level (HL2/HL3)
  • ☐ EN 61373 category and class (1A/1B/2)
  • ☐ Output voltage(s), current(s) and power
  • ☐ Isolation requirement (input-to-output)
  • ☐ Mechanical form factor and connector type
  • ☐ IP protection rating required
  • ☐ MTBF target (MIL-HDBK-217 or SN 29500)
  • ☐ Lifecycle support period (25 or 30 years)
  • ☐ Quantity (prototype + series volumes)
  • ☐ Delivery schedule and JIT requirements
  • ☐ Quality certifications required (ISO 9001 / IRIS)
  • ☐ Traceability requirements

12. Glossary

  • DC/DC converter: device converting one DC voltage level to another with galvanic isolation
  • DC/AC inverter: device converting DC (battery) to AC (single- or three-phase)
  • Hold-up time: time during which the output remains within specification after an input power interruption
  • MTBF: Mean Time Between Failures — statistical reliability metric (hours)
  • NRE: Non-Recurring Engineering — one-time design and tooling cost
  • OT class: Operating Temperature class as defined by EN 50155:2017
  • TCO: Total Cost of Ownership — full lifecycle cost including purchase, integration, maintenance and support
  • Type test: formal certification test campaign performed by an accredited laboratory on a representative sample
  • Unom: nominal battery supply voltage (24, 72 and 110 VDC are the most common in railway)

Need guidance for your next railway project?

With over 40 years of experience, more than 900 designs and in-house manufacturing in Barcelona, Premium SA designs power conversion systems for railway, industrial and extreme-environment applications.

Contact our engineering team

About Premium SA — Born in Barcelona, Powering the World. Specialist in custom power conversion systems since 1981, with more than 900 designs, in-house manufacturing in Barcelona and over 40 years serving railway, industrial and extreme-environment applications.
fuseWhitepapers

Real 5-year TCO: conventional fuse vs. eFuse in a 50-circuit 24 V DC industrial cabinet

White Paper · TCO Analysis

Real 5-year TCO: conventional fuse vs. eFuse in a 50-circuit 24 V DC industrial cabinet

Total cost of ownership of two 24 V DC circuit protection schemes in a representative industrial scenario

€7,994.50
Net saving over 5 years
14 months
eFuse payback
321%
5-year ROI
−82%
Cost reduction per event

Executive summary

This analysis compares the 5-year total cost of ownership (TCO) of two 24 V DC circuit protection schemes in a representative 50-channel industrial cabinet: conventional gG fuses vs. electronic fuses (eFuses) with LED signalling. The scenario assumes 6 fault events per year, a line downtime cost of €500/hour and technician labour at €65/hour. Result: the eFuse pays back its additional cost in 14 months and delivers a net saving of €7,994.50 over the 5-year horizon compared with the conventional fuse.

If you are new to this technology, we recommend starting with our introduction: what an electronic fuse (eFuse) is and why it is replacing conventional fuses in industrial control panels.

1. Definition of the analysis scenario

The analysis is based on an industrial installation representative of typical projects in the Spanish market: a production line with a control cabinet feeding 50 independent 24 V DC circuits (sensors, actuators, valves, small motors and drives). The scenario parameters are detailed below:

Scenario parameter Value used Source / rationale
Number of 24 V DC circuits 50 channels Typical industrial automation cabinet
Current per channel Mixed: 25× at 2 A, 15× at 4 A, 10× at 6 A Typical loads: sensors, valves, small motors
Circuit fault events / year 6 events Conservative estimate for an industrial environment with moderate EMC
Line downtime cost (€/hour) €500/hour Discrete manufacturing: typical range €200–2,000/hour
Technician labour cost (€/hour) €65/hour Qualified industrial electrician, Spain 2025
Analysis horizon 5 years (60 months) Typical life cycle of cabinet equipment
Discount rate 0% (nominal analysis) Conservative simplification; the eFuse advantage is greater with discounting

2. TCO of the conventional fuse

2.1 Initial investment costs

The material cost of protecting 50 channels with conventional fuses includes fuse holders, fuses of different ratings and the initial spare-parts stock:

Item Quantity Unit price (ref.) Subtotal
DIN rail fuse holders (per channel) 50 pcs €4.50 €225
gG 2 A fuses (25 channels) 25 pcs + 10 spare €0.80 €28
gG 4 A fuses (15 channels) 15 pcs + 6 spare €0.90 €19
gG 6 A fuses (10 channels) 10 pcs + 4 spare €1.10 €15
Installation labour (5 h × €65) 5 hours €65/h €325
Total initial investment €612

2.2 Annual operating costs

Each conventional fuse fault event in this scenario involves three types of cost: diagnosis (locating the blown fuse), line downtime and fuse replacement. The average diagnosis time in a 50-circuit cabinet without fault signalling is 45 minutes.

Cost component per event Time / qty Unit cost Cost / event Annual cost (6 ev.)
Diagnosis and location (technician) 45 min €65/h €48.75 €292.50
Line downtime (production stopped) 45 min €500/h €375.00 €2,250.00
Fuse replacement + stock 1 pc €1.00 €1.00 €6.00
Total cost per event → annual €424.75 €2,548.50
Conventional fuse TCO summary Amount 5-year cumulative
Initial investment (material + installation) €612 €612
Year 1 — fault events €2,548.50 €3,160.50
Year 2 €2,548.50 €5,709.00
Year 3 €2,548.50 €8,257.50
Year 4 €2,548.50 €10,806.00
Year 5 €2,548.50 €13,354.50
Total 5-year TCO — conventional fuse €13,354.50

3. TCO of the electronic fuse (eFuse)

3.1 Initial investment costs

Protecting 50 channels with eFuses requires 13 four-channel modules (12 full modules + 1 for the remaining 2 channels). A competitive module from the European market is used as the price reference (mid-to-high range, with per-channel LED signalling and adjustable current from 1 to 10 A):

Item Quantity Unit price (ref.) Subtotal
4-channel 24 V eFuse modules (mid-to-high range) 13 modules €200.00 €2,600
24 V/20 A DIN rail power supply (common supply) 2 pcs €120.00 €240
Installation labour (4 h × €65) 4 hours €65/h €260
Total initial investment €3,100
Note: eFuse installation labour is slightly lower than for conventional fuses because there is no need to install 50 individual fuse holders; the 4-channel modules connect more quickly to the DIN rail with push-in or standard screw terminals.

3.2 Annual operating costs

With the eFuse installed, the diagnosis process changes radically. The red LED of the faulty channel is visible on the front of the module without opening the cabinet. In installations with SCADA, the digital alarm signal indicates the exact channel in the supervision system. The average diagnosis time drops to 8 minutes. Reset is manual (push-button) or automatic depending on configuration; this scenario assumes manual mode for greater operator control.

Cost component per event Time / qty Unit cost Cost / event Annual cost (6 ev.)
Diagnosis and location (technician) 8 min €65/h €8.67 €52.00
Line downtime (production stopped) 8 min €500/h €66.67 €400.00
Component replacement 0 (none) €0 €0 €0
Total cost per event → annual €75.34 €452.00
Electronic fuse (eFuse) TCO summary Amount 5-year cumulative
Initial investment (modules + power supply + installation) €3,100 €3,100
Year 1 — fault events €452.00 €3,552
Year 2 €452.00 €4,004
Year 3 €452.00 €4,456
Year 4 €452.00 €4,908
Year 5 €452.00 €5,360
Total 5-year TCO — eFuse €5,360

4. Comparison and return analysis

Metric Conventional fuse Electronic fuse (eFuse)
Initial investment €612 €3,100
Annual operating cost (6 ev./year) €2,548.50 €452.00
3-year TCO €8,257.50 €4,456
5-year TCO €13,354.50 €5,360
Net saving over 5 years — €7,994.50
Break-even point (payback) — 14 months
Diagnosis time reduction Baseline (45 min) −82% (8 min)
Cost reduction per event Baseline (€424.75) −82% (€75.34)
Component replacement / year 6 fuses 0 (no consumables)

The eFuse pays back its additional investment of €2,488 (€3,100 − €612) in 14 months thanks to annual savings of €2,096.50 in diagnosis and downtime costs. Over the 5-year horizon, every additional euro invested in the eFuse returns €3.21 in net savings. The 5-year ROI on the additional investment is 321%.

5. Sensitivity of the result: when does the eFuse NOT pay off?

The analysis above assumes 6 fault events per year and a downtime cost of €500/hour. It is important to understand how the conclusion changes with different parameters:

Scenario Events/year Downtime cost (€/h) eFuse payback Conclusion
Continuous production (baseline) 6 €500 14 months eFuse clearly cost-effective
High fault frequency 12 €500 7 months eFuse highly cost-effective
Very costly downtime (data centre) 4 €2,000 6 months eFuse highly cost-effective
Low-demand installation 2 €200 91 months (about 7.5 years) Does not pay back within 5 years
Simple installation, few stoppages 1 €100 >10 years Conventional fuse more economical

The rule of thumb is as follows: if an installation with 50 circuits at 24 V DC suffers 2 or fewer fault events per year and the downtime cost is €200/hour or less, the conventional fuse may be economically preferable over a 5-year horizon. In all other typical industrial scenarios, the eFuse is the more cost-effective option.

The eFuse break-even threshold falls significantly in installations where remote monitoring of circuit status has independent added value (SCADA integration, predictive maintenance, compliance with functional safety requirements). In those cases, the eFuse with IO-Link is compared against the cost of installing a separate monitoring system — and generally comes out ahead.

6. Methodology and limitations of the analysis

This analysis is based on a representative industrial scenario, not on a specific real installation. The unit prices of the eFuse modules are indicative and vary by manufacturer, purchase volume and channel agreement. The operating cost parameters (downtime, labour) are estimates based on Spanish industrial sector references for 2025–2026.

  • Diagnosis costs assume a single technician working without additional remote diagnostic tools. Installing SCADA or an additional telemetry system would reduce diagnosis time with conventional fuses, changing the differential.
  • The analysis does not include the benefits of selective protection (preventing a fault in one channel from affecting adjacent channels), which in high-criticality installations can represent significant additional value.
  • Line downtime costs have the greatest influence on the final result. Each company should apply its own downtime cost to obtain an accurate estimate of its specific payback.

Want to calculate the TCO of your installation?

Share the real parameters of your cabinet and our engineering team will help you evaluate the protection of your 24 V DC circuits.

Contact our engineering team

About Premium SA — Founded in Barcelona in 1981, Premium SA designs and manufactures high-reliability custom power supplies and protection systems for industrial automation, energy and critical applications, with over 40 years of experience in custom power electronics.
icebergApplication Notes

Total Cost of Ownership (TCO) in Power Electronics: Why the Lowest Price Is Rarely the Best Decision

Application Note · Procurement & Reliability

Total Cost of Ownership (TCO) in Power Electronics: Why the Lowest Price Is Rarely the Best Decision

The hidden costs that never appear on the quotation, a practical framework for calculating TCO and five questions for your next procurement process.

In many competitive evaluations of power converters, unit price is the number-one decision factor, while TCO (Total Cost of Ownership) analysis is applied in only a minority of cases. This means that most purchasing decisions are made without considering the costs that actually determine the long-term economic impact.

This article explains why unit price is a misleading indicator, which hidden costs are usually ignored, and how to apply a practical TCO analysis to your next supplier evaluation.

The iceberg model: what you don’t see is what costs most

The unit price of the converter is the tip of the iceberg: visible, easy to compare and apparently decisive. Beneath the surface, however, there are seven cost categories that in many cases exceed the purchase price by a factor of 3 to 10:

  1. Cost of field failure. A converter failure on a train does not cost EUR 1,000 for the replacement unit. It costs between EUR 10,000 and 55,000 once you add vehicle downtime (EUR 1,500–5,000/day), technician call-out (EUR 2,000–8,000), urgent shipping of the spare (EUR 500–3,000), root-cause investigation (EUR 5,000–15,000) and contractual service penalties.
  2. Integration engineering. Changing supplier is not simply swapping one unit for another. It involves requalification, EMC testing, mechanical integration and documentation updates. Typical cost: EUR 30,000–75,000 per model.
  3. Life-cycle support. A supplier offering 5 years of product availability for a vehicle with a 30-year service life is not saving you money: it is creating an obsolescence problem that will cost more than EUR 50,000 per model when the product is discontinued.
  4. Warranty and after-sales costs. More restrictive warranty terms (1 year versus 5 years) and longer response times translate into higher operating costs.
  5. Logistics costs. Lead times of 16 weeks from Asia versus 4 weeks from Europe. Higher safety-stock costs. Risk of delays from sea freight, customs and supply-chain disruption.
  6. Training and documentation costs. A supplier providing documentation in English, Spanish and German reduces training costs for maintenance staff.
  7. Supply risk. The 2021–2023 supply-chain crisis showed that dependence on distant suppliers can stall projects for 6–12 months.

How to calculate TCO: a practical framework

Calculating TCO does not have to be complex. For a practical evaluation, use this simplified formula:

TCO = unit price + (NRE / project units) + (failure rate × cost per failure × years of service) + (obsolescence cost / affected units) + logistics delta

Where:

  • NRE is the non-recurring engineering cost (integration, qualification, documentation).
  • The failure rate is derived from the equipment MTBF.
  • The cost per failure includes all direct and indirect costs.
  • The obsolescence cost is the redesign required when the product is discontinued.
  • The logistics delta is the difference in inventory and transport costs between suppliers.

Example: when the cheapest converter costs twice as much

Consider two quotations for a railway DC/DC converter in a 200-unit project with a 25-year service life:

Item Supplier A Supplier B
Unit price EUR 800 EUR 550
Declared MTBF 100,000 h (MIL-HDBK-217F, 40 °C) 60,000 h (Telcordia, 25 °C)
Warranty 5 years 2 years
Product availability 20+ years 7 years
Lead time 4 weeks (Europe) 16 weeks (Asia)

Supplier B looks 31% cheaper. But when TCO is calculated, Supplier B’s real MTBF (adjusted to MIL-HDBK-217F at 40 °C) is approximately 25,000 hours, which means 4 times more field failures. The total cost of failures over 25 years is 3–5 times the unit-price saving. In addition, Supplier B will require at least 3 obsolescence redesigns over 25 years (cost: EUR 90,000+).

Result: Supplier B’s TCO is 40–60% higher than Supplier A’s.

Five questions for your next procurement process

Build these questions into every power-electronics supplier evaluation:

  1. Give me the MTBF according to MIL-HDBK-217F at 40 °C ambient. If the supplier cannot or will not, ask yourself why.
  2. What is your written commitment on spare-part and product availability? Accept only contractual commitments, not verbal ones.
  3. What is your obsolescence management plan? When a key component reaches end of life, what is the process and who bears the cost of the redesign?
  4. What is your real lead time and where do you manufacture? If the project cannot absorb a 4-week transport delay, you need European manufacturing.
  5. Give me a TCO breakdown, not just the unit price. The suppliers who can do this, and are willing to, are the ones worth having as partners.

These five questions will steer your supplier list towards companies that deliver long-term value, not just short-term savings. To go deeper into how reliability is designed in to reduce TCO, see our white paper on reliability in critical power electronics.

Want to apply a TCO analysis to your next supplier evaluation? Our technical team can help you quantify the hidden costs.

About Premium PSU

Premium PSU (Premium SA) designs and manufactures custom power supplies and power converters in Barcelona, with over 40 years of experience in railway, energy, industrial, data centre and defence applications.