40+ Year Reliability in Critical Power Electronics: The Premium SA Approach
Physics-of-Failure, DFR methodology, RAMS metrics and PHM — for directors of engineering, procurement and operations

Born in Barcelona, Powering the World
Introduction: From Unit Price to Total Cost of Ownership
In critical infrastructure — rolling stock, electrical substations, signalling systems, continuous-process plants — the cost of one hour of unavailability far exceeds the price of any electronic converter. Over the last decade, the fraction of total cost of ownership attributable to the acquisition price has fallen below 30% in railway and substation grid applications; the remaining 70% is split between energy consumed, scheduled maintenance, spare parts and, above all, unavailability.
The result is that the purchase decision has migrated from unit price to total cost of ownership. The real question is no
longer “how much does it cost?” but “how long will it last and how will you prove it?”
1. Why Power Electronics Fails — The Physical Mechanisms
Electronic components do not fail randomly: they fail through identifiable, modellable and predictable physical mechanisms. The Physics-of-Failure (PoF) methodology — which Premium SA adopts as primary reference, as opposed to the outdated MIL-HDBK-217F — classifies these mechanisms into four families:
1. Thermo-Mechanical Mechanisms
Dominant in power modules (IGBT, MOSFET, SiC). Every thermal cycle causes materials with different coefficients of thermal expansion (CTE) to expand and contract at different rates, accumulating plastic deformation in solder joints and bond wires.
- Solder fatigue: Coffin-Manson model: Nf ∝ ΔTj−n with n ≈ 5–7. Increasing Rth(j-c) → vicious circle of rising Tj and accelerating degradation
- Wire-bond lift-off: Main cause of wear-out failure in traction IGBT modules. Each lost wire increases current in remaining ones, accelerating the next failure
2. Electrical & Dielectric Mechanisms
Active semiconductors age through electrical causes, with no need for thermal cycles. Degradation accumulates during normal operation.
- TDDB: Gate oxide traps accumulate until resistive conduction path forms. Arrhenius model with electric field accelerator
- Electromigration: Black model with J² as main variable. Opens voids or creates shorts in metallisation traces
- Hot Carrier Injection (HCI): Particularly relevant in fast-switching SiC and GaN transistors
- NBTI/PBTI: Gradual transconductance gm reduction under bias at high temperature
3. Chemical & Environmental Mechanisms
Humidity, contaminants, salts and radiation present in any real installation.
- Corrosion and electrochemical migration: Dendrite formation (whisker effect) causing intermittent shorts. Peck model (humidity × temperature)
- Radiation-induced errors (SEU): Cosmic ray neutrons and alpha particles causing Single Event Upsets in memory cells. Mitigated by design: ECC, watchdogs, logical redundancy
4. Mechanical Mechanisms
In railway applications under EN 61373 (category 1B body-mounted), equipment absorbs 5–50 m/s² of random vibration over full life. Critical points: solder joints of heavy components (electrolytics, ferrites, transformers) and connectors. Design control: first mechanical PCB frequency clearly above dominant excitation range (>75 Hz).
2. The Bathtub Curve — Each Phase Calls for a Different Technique
Electronic components exhibit three recognised phases: infant mortality (high initial failure rate from latent manufacturing defects), useful life (low and approximately constant rate), and wear-out (rising rate from accumulation of physical mechanisms). A mature DFR process attacks all three simultaneously.
| Technique | Phase Addressed | When Applied | Premium SA Standard |
|---|---|---|---|
| HALT (Highly Accelerated Life Testing) | Design margin discovery | Design phase on prototypes | Combined temperature + vibration stresses beyond specification limits |
| HASS (Highly Accelerated Stress Screening) | Latent manufacturing defects | Production screening | Stress levels just below operating limit; 100% of production units |
| Burn-in | Infant mortality (left tail) | Post-production, pre-delivery | 4 h per unit at +60 to +80 °C; extendable to 8 h for long-interval programmes |
3. RAMS — The Contractual Language of Reliability
RAMS stands for Reliability, Availability, Maintainability, Safety — the four metrics with which a railway operator or grid DSO measure equipment suitability over its useful life. EN 50126 is the framework standard; EN 50128 and EN 50129 cover software and functional safety respectively.
Reliability
R(t) — probability of surviving to time t. Expressed as MTBF = 1/λ for exponential distribution, or by Weibull parameters (β, η) for wear-out phases. Premium SA calculates MTBF by PoF, not by parts-count (MIL-HDBK-217F).
Availability
A = MTBF / (MTBF + MTTR). For a substation converter with MTBF = 500,000 h and MTTR = 4 h: A ≈ 99.9992%. The key lever is not only increasing MTBF but also reducing MTTR.
Maintainability
Design levers: LRU architecture (front access, two captive screws, keyed connectors), built-in telemetry and self-test, RUL (Remaining Useful Life) estimation via PHM, and 40+ year spares continuity with quarterly obsolescence review.
Safety — EN 50128 / 50129
SIL (Safety Integrity Level) per IEC 61508. PFD (Probability of Failure on Demand) for standby safety functions. SIL 3–4 requires: redundancy, periodic self-test, MC/DC software coverage metrics, formal methods. Premium SA D4Co-SW methodology aligned with EN 50128.
4. The Premium SA DFR Process — Four Sequential Gates
The Design for Reliability (DFR) methodology — originated at the Center of Reliable Power Electronics (CORPE, Aalborg University) and adopted as an internal standard at Premium SA — structures development in four sequential gates with quantitative exit criteria:
| Gate | Objective | Key Activities | Exit Criterion |
|---|---|---|---|
| D2W (Design to Work) | Functional specification | Mission profile definition, requirements capture, architecture selection | Signed mission profile + functional test pass |
| D2F (Design to Function) | Derating and PoF analysis | Tj_max ≤ 80%, Vop ≤ 80%, thermal simulation, stress analysis | All derating targets met; no RPN > 80 open |
| D4R (Design for Reliability) | FMEA, FTA, HALT | FMEA bottom-up + FTA top-down; HALT protocol; Coffin-Manson solder analysis | RPN > 100 blocked; HALT limits documented; MTBF target verified |
| D4Co (Design for Compliance) | Qualification and FRACAS | HASS production screening; burn-in; EMC pre-compliance; EN 50155/EN 61373 qualification | All certifications obtained; FRACAS activated; customer RAMS deliverables signed |
5. FMEA, FTA and the Analytical Hierarchy
Once derating is established, reliability engineering identifies and mitigates dominant failure modes through three complementary analyses:
- FMEA/FMECA (Failure Mode and Effects Analysis): Bottom-up. RPN = Severity × Occurrence × Detection (1–10 scale). At Premium SA, any RPN >80 triggers a documented action plan; RPN >100 blocks the D4Co gate.
- FTA (Fault Tree Analysis): Top-down. Decomposes boolean combinations (AND/OR gates) that may cause system fault. Quantifies impact of redundancies; allows calculation of system-level MTBF.
- ETA (Event Tree Analysis): Inductive. Models scenarios and responses derived from a single initiating event. Useful for evaluating fault propagation in multi-state systems.
6. Keeping Reliability in Service — PHM, FRACAS and Lean Reliability
PHM — Prognostics and Health Management
The active technical frontier today is the transition from fixed-schedule preventive maintenance towards maintenance based on actual condition. In Premium SA converters:
- Real-time Tj estimation of semiconductors from Vce_sat and current, with case-temperature compensation
- Cumulative power-cycle counting with associated ΔTj, to predict RUL (Remaining Useful Life) by PoF models
- ESR monitoring of capacitors by ripple analysis
- Periodic export of operating data over communication bus to the operator’s supervisor, with P-F (potential-functional) profile
FRACAS — The Continuous-Learning Loop
Failure Reporting, Analysis and Corrective Action System: every field return is analysed at the appropriate level — LRU, board, component — root cause is identified, and the corrective action is propagated to design and production. The consequence is that the population of installed equipment improves over time rather than degrading. The problem detected in unit #150 is prevented in unit #151.
About Premium SA — Premium SA is a Barcelona-based manufacturer of power electronics converters for railway, industrial and energy applications. Founded in 1981, with more than 900 standard product designs and over 40 years of operational experience, Premium SA supplies DC/DC converters, DC/AC inverters, AC/AC frequency converters, battery chargers, rectifiers and UPS systems from 50 W to 72 kW. All products are designed and manufactured at the Premium SA plant in Barcelona, with capability for EN 50155, EN 50121-3-2, EN 45545-2 and EN 61373 certification. Premium SA serves OEMs and system integrators across Europe through direct sales and a network of specialist distributors — ELIPSE (Benelux), Elma Electronic (Switzerland), RELEC Electronics (United Kingdom), DACPOL (Poland and Central Europe) and ANDA-OLSEN (Scandinavia).
Premium SA · Barcelona, Spain · info@premiumpsu.com · +34 932 232 685 · www.premiumpsu.com
Application NotesEN 50155: A Practical Guide to Specifying Railway Electronics
EN 50155: A Practical Guide to Specifying Railway Electronics
Temperature classes, voltage ranges, supply interruptions and companion standards: how to move from “EN 50155 compliant” to an unambiguous specification.
EN 50155:2017 is the European standard that defines the requirements for electronic equipment used on railway rolling stock. Any power converter, inverter, battery charger or electronic system installed on a train in Europe must comply with it. Yet it is in the way compliance is specified that most mistakes are made.
This article explains, in practical terms, how to use EN 50155 to specify the power electronics of a railway project correctly. It is not an academic summary of the standard: it is an operational guide based on what we have learned across hundreds of railway projects. For a general introduction to the standard, see What is EN 50155 for railway applications?
The most common mistake: “EN 50155 compliant”
Specifying that a unit must be “EN 50155 compliant” is like ordering a car “compliant with emissions regulations” without saying whether you need a city runabout or an off-roader. EN 50155 defines a framework of options, and each project must select the right ones. If your specification simply says “EN 50155”, the supplier will choose the options that are easiest (and cheapest) to meet, which may not be the ones your application needs.
Parameter 1: temperature class
EN 50155 defines six temperature classes that set the operating range of the equipment:
| Class | Operating range | Typical application |
|---|---|---|
| OT1 | −25 °C to +55 °C | Passenger compartments and driver’s cabs |
| OT2 | −40 °C to +55 °C | Passenger compartments and driver’s cabs in cold climates |
| OT3 | −25 °C to +70 °C | Technical cabinets and equipment compartments (default class) |
| OT4 | −40 °C to +70 °C | Technical cabinets in cold climates |
| OT5 | −25 °C to +85 °C | High-temperature locations (e.g. roof or underframe equipment) |
| OT6 | −40 °C to +85 °C | High-temperature locations in cold climates |
Choosing the temperature class is not trivial. Our ODS-3000 inverter was originally designed for a lower operating limit of −25 °C. When a rolling-stock manufacturer needed a −40 °C variant for arctic service, we had to change the electrolytic capacitors (standard parts lose 80% of their capacitance at −40 °C), add a pre-conditioning circuit and run a full qualification campaign including 96-hour soaks at −40 °C.
Parameter 2: input voltage range
The standard defines nominal voltage ranges for the train’s DC buses:
| Nominal voltage | Continuous operating range (0.7–1.25 Un) |
|---|---|
| 24 Vdc | 16.8 – 30.0 Vdc |
| 48 Vdc | 33.6 – 60.0 Vdc |
| 72 Vdc | 50.4 – 90.0 Vdc |
| 96 Vdc | 67.2 – 120.0 Vdc |
| 110 Vdc | 77.0 – 137.5 Vdc |
Short fluctuations from 0.6 Un (0.1 s) up to 1.4 Un (1 s) must also be withstood. The converter must operate correctly across the whole specified range, including the transient conditions defined in the standard. Always specify the full range, not just the nominal voltage.
Parameter 3: supply interruption class
EN 50155 defines how equipment must behave when the supply is briefly interrupted (for example, when crossing a neutral section or when the pantograph loses contact with the overhead line):
- S1: no ride-through. The unit shuts down and restarts when the supply returns.
- S2: 10 ms ride-through. Withstands short interruptions without restarting.
- S3: 20 ms ride-through.
For critical systems (protection, communications, signalling), S2 or S3 is usual. For comfort systems (passenger sockets, non-essential lighting), S1 may be acceptable.
Beyond EN 50155: the companion standards
EN 50155 is not the only applicable standard. All railway electronic equipment must also comply with:
- EN 50121-3-2: electromagnetic compatibility (EMC). The electromagnetic environment on a train is extremely harsh.
- EN 45545-2: fire protection. Materials must meet specific requirements for flammability, smoke emission and toxicity.
- EN 61373: shock and vibration. Vibration levels on rolling stock are significantly more severe than in industrial applications.
Make sure your specification covers all four standards. A unit that meets EN 50155 but not EN 45545-2 cannot be installed on a European train.
How to specify correctly: a practical summary
For your next project, include at least the following in the specification:
- Temperature class (OT1–OT6).
- Nominal voltage and full operating range.
- Supply interruption class (S1/S2/S3).
- EMC requirements (EN 50121-3-2).
- Fire class (EN 45545-2, stating the hazard level HL1/HL2/HL3).
- Vibration category (EN 61373: Cat. 1 body-mounted (Class A or B), Cat. 2 bogie-mounted, Cat. 3 axle-mounted).
With these six parameters clearly defined, you will receive comparable quotations and avoid the surprises that appear when a specification is ambiguous. Need help specifying EN 50155 power electronics? Our technical team in Barcelona can advise you.
About Premium PSU
Premium PSU (Premium SA) designs and manufactures custom power supplies and power converters in Barcelona, with over 40 years of experience in railway, energy, industrial, data centre and defence applications.
Talk to our engineering team
Discuss your power conversion requirements with Premium PSU.
Application NotesTotal Cost of Ownership (TCO) in Power Electronics: Why the Lowest Price Is Rarely the Best Decision
Total Cost of Ownership (TCO) in Power Electronics: Why the Lowest Price Is Rarely the Best Decision
The hidden costs that never appear on the quotation, a practical framework for calculating TCO and five questions for your next procurement process.
In many competitive evaluations of power converters, unit price is the number-one decision factor, while TCO (Total Cost of Ownership) analysis is applied in only a minority of cases. This means that most purchasing decisions are made without considering the costs that actually determine the long-term economic impact.
This article explains why unit price is a misleading indicator, which hidden costs are usually ignored, and how to apply a practical TCO analysis to your next supplier evaluation.
The iceberg model: what you don’t see is what costs most
The unit price of the converter is the tip of the iceberg: visible, easy to compare and apparently decisive. Beneath the surface, however, there are seven cost categories that in many cases exceed the purchase price by a factor of 3 to 10:
- Cost of field failure. A converter failure on a train does not cost EUR 1,000 for the replacement unit. It costs between EUR 10,000 and 55,000 once you add vehicle downtime (EUR 1,500–5,000/day), technician call-out (EUR 2,000–8,000), urgent shipping of the spare (EUR 500–3,000), root-cause investigation (EUR 5,000–15,000) and contractual service penalties.
- Integration engineering. Changing supplier is not simply swapping one unit for another. It involves requalification, EMC testing, mechanical integration and documentation updates. Typical cost: EUR 30,000–75,000 per model.
- Life-cycle support. A supplier offering 5 years of product availability for a vehicle with a 30-year service life is not saving you money: it is creating an obsolescence problem that will cost more than EUR 50,000 per model when the product is discontinued.
- Warranty and after-sales costs. More restrictive warranty terms (1 year versus 5 years) and longer response times translate into higher operating costs.
- Logistics costs. Lead times of 16 weeks from Asia versus 4 weeks from Europe. Higher safety-stock costs. Risk of delays from sea freight, customs and supply-chain disruption.
- Training and documentation costs. A supplier providing documentation in English, Spanish and German reduces training costs for maintenance staff.
- Supply risk. The 2021–2023 supply-chain crisis showed that dependence on distant suppliers can stall projects for 6–12 months.
How to calculate TCO: a practical framework
Calculating TCO does not have to be complex. For a practical evaluation, use this simplified formula:
TCO = unit price + (NRE / project units) + (failure rate × cost per failure × years of service) + (obsolescence cost / affected units) + logistics delta
Where:
- NRE is the non-recurring engineering cost (integration, qualification, documentation).
- The failure rate is derived from the equipment MTBF.
- The cost per failure includes all direct and indirect costs.
- The obsolescence cost is the redesign required when the product is discontinued.
- The logistics delta is the difference in inventory and transport costs between suppliers.
Example: when the cheapest converter costs twice as much
Consider two quotations for a railway DC/DC converter in a 200-unit project with a 25-year service life:
| Item | Supplier A | Supplier B |
|---|---|---|
| Unit price | EUR 800 | EUR 550 |
| Declared MTBF | 100,000 h (MIL-HDBK-217F, 40 °C) | 60,000 h (Telcordia, 25 °C) |
| Warranty | 5 years | 2 years |
| Product availability | 20+ years | 7 years |
| Lead time | 4 weeks (Europe) | 16 weeks (Asia) |
Supplier B looks 31% cheaper. But when TCO is calculated, Supplier B’s real MTBF (adjusted to MIL-HDBK-217F at 40 °C) is approximately 25,000 hours, which means 4 times more field failures. The total cost of failures over 25 years is 3–5 times the unit-price saving. In addition, Supplier B will require at least 3 obsolescence redesigns over 25 years (cost: EUR 90,000+).
Result: Supplier B’s TCO is 40–60% higher than Supplier A’s.
Five questions for your next procurement process
Build these questions into every power-electronics supplier evaluation:
- Give me the MTBF according to MIL-HDBK-217F at 40 °C ambient. If the supplier cannot or will not, ask yourself why.
- What is your written commitment on spare-part and product availability? Accept only contractual commitments, not verbal ones.
- What is your obsolescence management plan? When a key component reaches end of life, what is the process and who bears the cost of the redesign?
- What is your real lead time and where do you manufacture? If the project cannot absorb a 4-week transport delay, you need European manufacturing.
- Give me a TCO breakdown, not just the unit price. The suppliers who can do this, and are willing to, are the ones worth having as partners.
These five questions will steer your supplier list towards companies that deliver long-term value, not just short-term savings. To go deeper into how reliability is designed in to reduce TCO, see our white paper on reliability in critical power electronics.
Want to apply a TCO analysis to your next supplier evaluation? Our technical team can help you quantify the hidden costs.